Data Centre — Ireland

Mace Data Centre Case Study

Mace Group

Customer

Mace Group

Location

Clonee, Co Meath, Ireland

Industry

Data Centre — Ireland

Project Cost

€650 million

Background

This commercial development project consisted of three single-storey data centres, split into three phases on a 95-hectare greenfield site in Clonee, Co Meath, Ireland. The data centre buildings include rooftop mechanical equipment measuring up to 8.6m to the roof eaves, with a parapet wall up to 9.1m and roof-mounted plant screen wall up to 15.9m. Site infrastructure includes access roads, car parking, internal roads, entrance security hut, landscaping, and a 220kV substation. The project constituted highly modular off-site production, effectively acting as a system comprising hundreds of off-site modules. The team had to factor in each micro-level detail of logistics, production pace, resources, and other potential constraints.

Challenges

  • Working at height across large-scale data centre structures
  • Delay in handovers between trades and project phases
  • Latency in progress updates from site to the planning team

Solution

VisiLean was deployed as the integrated lean-BIM production management platform:

Dynamic BIM Integration — VisiLean dynamically linked production plans to the 3D BIM model, improving trade handovers and enabling real-time activity tracking.

Regimented Supply Chain Process — A regimented process in collaboration with the supply chain ensured strict discipline in planning, scheduling, and control processes.

Systematic Planning & Execution — VisiLean as a Lean and BIM integrated system replaced traditional sticky notes with a systematic planning and execution system.

Outcomes & Impact

  • 60% reduction in project defects through improved planning and coordination
  • 45% reduction in labour spend across the entire project lifecycle

Key Learnings

  • Integrated lean-BIM platforms are essential for managing highly modular off-site production at scale
  • Dynamic linking of production plans to 3D BIM models significantly improves trade handover quality
  • Strict discipline in planning processes across the supply chain is critical for large data centre projects

Download Full Case Study

Fill in your details to download the complete “Mace Data Centre Case Study” case study as a PDF.

Share

Ready to transform your project delivery?

Join contractors across 20+ countries achieving real results with VisiLean.