Takt Planning
Takt Planning Software
for Construction Projects
Integrate CPM scheduling, Last Planner® and Takt planning in one platform — with rhythmic trade flow, zone-based control, and real-time field updates.
Reduction in Defects
Programme Efficiency
Less Labour Spend
Active Customers
Takt Planning Features
Everything you need for rhythmic trade flow
Zone-Based Planning
Import drawings, define work zones graphically. Assign trades and durations per zone. Visualise the complete zone sequence.
Takt Time Control
Set rhythmic Takt time per trade. Balance workload across zones. Identify bottlenecks before they cascade.
Trade Flow Visualisation
See the wagon wheel of trade movement. Track actual vs planned across all zones. Identify interference patterns.
Connected to CPM
Takt plan links directly to your master CPM schedule. Changes propagate. Dependencies are respected.
Mobile Zone Updates
Field crews update zone progress from the LiveSite app. Three taps. The office sees it live.
Analytics & Reporting
Takt cycle performance, zone completion rates, trade productivity metrics. Power BI integration.
Discover Our Features
Discover our Features for Takt Planning
Streamlined Trade Flow
Takt planning ensures continuous workflow by synchronising trades rhythmically across zones, keeping every trade moving without interference.
- Rhythmic Synchronisation: Takt planning ensures continuous workflow by synchronising trades rhythmically across zones.
- Scope of Work (Wagon): Each Takt beat represents a comprehensive scope of work involving multiple trades in specific zones.
- One-Page Clarity: Utilise a single-page Takt plan for a clear and concise description of your workflow.
Precision Planning
Create detailed 2D zones within the Takt Visualiser. Import floor plans and link 2D markups for cohesive workflows.
- Effortless 2D Zones: Easily create detailed 2D zones within the Takt Visualiser.
- Seamless Integration: Import floor plans and link 2D markups for cohesive workflows.
- Dual-View Efficiency: View zones in split screen while crafting your Takt plan.
Effortless Task Management
Intuitively create Takt tasks with drag-and-drop ease. Seamlessly visualise Takt plans in both daily and weekly formats.
- Drag 'n Drop Simplicity: Intuitively create Takt tasks with drag-and-drop ease.
- Daily & Weekly Views: Seamlessly visualise Takt plans in both daily and weekly formats.
- Trade Identification: Easily identify trades for better coordination.
Effortless Takt Plan Creation
Select individual tasks, group them, or leverage pre-built wagons to effortlessly build your Takt plan.
- Pre-built Wagons: Select individual tasks, group them, or leverage pre-built wagons to effortlessly build your Takt plan.
- Tailored Visibility: Define template visibility and share it across projects, or for personal use.
- Unified Templates Manager: Centralize tasks, templates, and sequences with a shared repository for consistency.
One-Click Efficiency
Load necessary data, filter results, and set date ranges with a single click. Create custom configurations for focused discussions.
- Quick Data Loading: Load necessary data, filter results, and set date ranges with a single click.
- Meeting Mastery: Create custom configurations and effortlessly load them during meetings for focused discussions.
- Pre-defined Convenience: Quickly access frequently used data with options like 'Last Week' or 'Next Month.'
Seamless Reporting
Generate reports from screen configurations, Takt canvas, 2D BIM integrations, or embed external links.
- Direct Report Generation: Generate reports from screen configurations, Takt canvas, 2D BIM integrations, or embed external links.
- Collaborative Canvas Reports: Use the canvas report as a collaborative planning tool for zone planning, trade flows, and logistical strategies.
- Configuration Reports: Leverage configuration reports for project reviews and progress meetings, and easily export PDFs of deliverables.
Progress Management
Review and update plans with Takt Control’s comprehensive toolkit. Compare planned vs. actual performance within each zone.
- Progress at a Glance: Review and update plans with Takt Control’s comprehensive toolkit.
- Plan vs. Actual: Compare planned vs. actual performance within each zone for a bird’s-eye view.
- Live Mode: Reflect task status and actual dates dynamically to identify issues early.
Automated Reporting Freedom
Schedule reports at set frequencies and times, ensuring everyone receives the information they need automatically.
- Scheduled Reports: Break free from manual report exports! Schedule reports at set frequencies and times, ensuring everyone receives the information they need automatically.
- Streamlined Meeting Preparation: Utilise report automation to prepare for meetings beforehand and circulate agendas with ease.
- Enhanced Stakeholder Engagement: Combine report automation with the Viewer role functionality. Grant stakeholders controlled access to view relevant VisiLean configurations, fostering transparency and project buy-in.
How It Works
From drawings to rhythmic flow in three steps
Import your plans, set Takt times, and let VisiLean balance the trade flow. Three steps to manufacturing-grade efficiency on site.
Typically live on your first project within 2 weeks
Upload floor plans or drawings. Define work zones graphically — drag boundaries directly on the plan.